Talisker Intersects 96.9 g/t Au over 0.5 Metres within 34.58 g/t Au over 1.5 Metres at Bralorne

    You can use your smart phone to browse stories in the comfort of your hand. Simply browse this site on your smart phone.

    Using an RSS Reader you can access most recent stories and other feeds posted on this network.

    SNetwork Recent Stories

Talisker Intersects 96.9 g/t Au over 0.5 Metres within 34.58 g/t Au over 1.5 Metres at Bralorne

by ahnationtalk on October 13, 202110 Views

Toronto, Ontario, October 13, 2021 – Talisker Resources Ltd. (“Talisker” or the “Company”) (TSX:TSK | OTCQX:TSKFF) is pleased to announce high grade results from drill hole SB-2021-058 at its 100% owned flagship Bralorne Gold Project. Five diamond drill rigs are currently drilling at Bralorne. A total of 65,254 metres consisting of 116 holes of the planned and fully funded 100,000 metre drill program has been drilled at the project this year with a total of 87,425 metres (152 holes) having been drilled since Talisker initiated drilling at the project in February 2020. There are currently 22 holes consisting of 6,951 samples at the assay laboratory that are expected to be received by the Company shortly.

Talisker is concurrently drilling a high-grade narrow vein resource within 700 metres from surface at the Bralorne Gold Project and a close to surface (<350m) bulk tonnage resource at Pioneer.

Key Points:

  • Successful intercept targeting the 55HW Vein, 55 Vein and 55FW vein returning 96.9 g/t gold over 0.5m within 34.58 g/t gold over 1.5m (55HW), 8.0 g/t over 1.0m (55 Vein) and 8.53 g/t over 1.0m (55FW).
  • Previous intercepts in the 55HW Vein are highlighted by hole SB-2020-012 (15.11 g/t over 1.0m), SB-2021-020 (14.66 g/t over 1.5m) and SB-2021-043 (19.76 g/t over 1.0m).
  • Previous intercepts in the 55 Vein are highlighted by Hole SB-2020-015 (43.64 g/t over 1.20m) and SB-2021-011 (13.05 g/t over 1.05m).
  • This hole increases the number of intercepts for the 55HW vein to 31 with three holes remaining to be drilled. On the 55 Vein, 30 intercepts and three holes remain to be drilled. The remaining holes on the 55HW and 55 veins will be completed by the end of the 2021 initial resource drill out program.
  • Hole SB-2021-023, SB-2021-046 also intersected the 55HW vein and results are expected shortly.

SB-2021-058 Hole Description:

  • Complete preliminary results have been received for this hole.
  • Located in the Bralorne West block on the northwest margin of the granitic intrusive.
  • Intersected multiple plugs of granitic intrusive hosted within diorite to 460m followed by diorite to completion at 746.2m.
  • 55HW Vein intersected from 603.7m to 605.2m
  • 55 Vein intersected from 676.1m to 676.95m with visible gold.
  • 55FW Vein intersected as a void (historical drift) from 724.55m to 725.85m. Mineralized portion of the 55FW vein intersected adjacent to the void from 725.85m to 726.85m.
  • Both veins considered classic Bralorne crack-seal quartz-carbonate veins with densely banded sulphide septae, brecciated sections and hosting strong fine-grained arsenopyrite and pyrite mineralization with strong silica-sericite-mariposite alteration.

Table 1: Bralorne Gold Project – Drill Hole SB-2021-058

Diamond Drill From To Interval Au Zone Method Reported
Hole Name (m) (m) (m) (g/t)
SB-2021-058 15.5 16 0.5 1.10 Au-AA26
SB-2021-058 16 17.5 1.5 0.46 Unknown Bulk Au-AA26
SB-2021-058 17.5 18 0.5 0.34 Zone Au-AA26
SB-2021-058 18 18.85 0.85 1.33 Au-AA26

Table 1: Bralorne Gold Project – Drill Hole SB-2021-058

Diamond Drill From To Interval Au Zone Method Reported
Hole Name (m) (m) (m) (g/t)
SB-2021-058 18.85 19.35 0.5 0.55 Au-AA26
SB-2021-058 19.35 19.85 0.5 0.46 Au-AA26
SB-2021-058 19.85 21 1.15 2.68 Au-AA26
SB-2021-058 21 21.5 0.5 1.79 Au-AA26
SB-2021-058 21.5 22 0.5 1.04 Au-AA26
SB-2021-058 22 23 1 2.35 Au-AA26
SB-2021-058 23 24 1 6.84 Au-AA26
SB-2021-058 24 25 1 5.46 Au-AA26
SB-2021-058 25 25.5 0.5 2.34 Au-AA26
SB-2021-058 25.5 26.3 0.8 3.07 Au-AA26
SB-2021-058 26.3 26.8 0.5 0.64 Au-AA26
SB-2021-058 26.8 27.3 0.5 0.08 Au-AA26
SB-2021-058 27.3 27.8 0.5 0.70 Au-AA26
SB-2021-058 27.8 28.5 0.7 1.62 Unknown Bulk Au-AA26
SB-2021-058 28.5 29 0.5 0.40 Zone Au-AA26
SB-2021-058 29 30 1 1.54 Au-AA26
SB-2021-058 30 30.75 0.75 2.01 Au-AA26
SB-2021-058 30.75 31.25 0.5 30.00 Au-AA26
SB-2021-058 31.25 32 0.75 0.75 Au-AA26
SB-2021-058 32 33 1 0.31 Au-AA26
SB-2021-058 33 34 1 0.11 Au-AA26
SB-2021-058 34 35 1 0.12 Au-AA26
SB-2021-058 35 35.85 0.85 1.82 Au-AA26
SB-2021-058 35.85 37 1.15 0.78 Au-AA26
SB-2021-058 37 38 1 0.06 Au-AA26
SB-2021-058 38 39 1 0.10 Au-AA26
SB-2021-058 39 40.5 1.5 0.35 Au-AA26
SB-2021-058 40.5 41.2 0.7 0.37 Au-AA26
SB-2021-058 359.2 360.45 1.25 0.14 Au-AA26
SB-2021-058 360.45 360.95 0.5 3.14 Unknown Vein Au-AA26
SB-2021-058 360.95 361.6 0.65 1.66 Au-AA26
SB-2021-058 361.6 362.1 0.5 11.00 Au-AA26
SB-2021-058 362.1 362.7 0.6 0.16 Au-AA26
SB-2021-058 603.7 604.2 0.5 4.69 Au-AA26
SB-2021-058 604.2 604.7 0.5 96.90 55HW Vein Au-AA26
SB-2021-058 604.7 605.2 0.5 2.14 Au-AA26
SB-2021-058 605.2 605.7 0.5 0.11 Au-AA26
SB-2021-058 673.55 674.65 1.1 0.15 Au-AA26
SB-2021-058 674.65 675.5 0.85 1.74 55 Vein Au-AA26
SB-2021-058 675.5 676 0.5 1.25 Au-AA26
SB-2021-058 676 676.5 0.5 3.25 Au-AA26
SB-2021-058 676.5 677 0.5 12.75 Au-AA26

Table 1: Bralorne Gold Project – Drill Hole SB-2021-058

Diamond Drill From To Interval Au Zone Method Reported
Hole Name (m) (m) (m) (g/t)
SB-2021-058 723.2 723.9 0.7 5.39 55FW Vein Au-AA26
SB-2021-058 723.9 724.55 0.65 1.59 Au-AA26
SB-2021-058 724.55 725.85 1.3 0.00 VOID Au-AA26
SB-2021-058 725.85 726.35 0.5 9.61 55FW Vein Au-AA26
SB-2021-058 726.35 726.85 0.5 7.45 Au-AA26
SB-2021-058 726.85 727.4 0.55 0.29 Au-AA26

Notes: Diamond drill hole SB-2021-058 has collar orientation of Azimuth 171; Dip -54. True widths are estimated at 40 – 90% of intercept lengths and are based on oriented core measurements where available. Method Reported includes the most up to date information as of the date of this press release.

Qualified Person

The technical information contained in this news release relating to the drill results at the Bralorne Gold Project has been approved by Leonardo de Souza (BSc, AusIMM (CP) Membership 224827), Talisker’s Vice President, Exploration and Resource Development, who is a “qualified person” within the meaning of National Instrument 43-101, Standards of Disclosure for Mineral Projects.

About Talisker Resources Ltd.

Talisker ( taliskerresources.com) is a junior resource company involved in the exploration of gold projects in British Columbia, Canada. Talisker’s projects include two advanced stage projects, the Bralorne Gold Complex and the Ladner Gold Project, both advanced stage projects with significant exploration potential from historical high-grade producing gold mines, as well as its Spences Bridge Project where the Company holds ~85% of the emerging Spences Bridge Gold Belt and several other early-stage Greenfields projects. With its properties comprising 296,983 hectares over 346 claims, three leases and 198 crown grant claims, Talisker is a dominant exploration player in the south-central British Columbia. The Company is well funded to advance its aggressive systematic exploration program at its projects.

For further information, please contact:

Terry Harbort

President & CEO

[email protected]

+1 416 361 2808

NT4

Send To Friend Email Print Story

Comments are closed.

NationTalk Partners & Sponsors Learn More